TL;DR - Put a fact every document repeats, like your client's name, in a SmartField. Insert it wherever the fact appears. When it changes, change it once - click it in any document - and every section, in every document, updates.
Who this is for
Anyone writing project documents can insert SmartFields. Creating or changing one needs Manage SmartFields on your project role (see Common questions).
Why SmartFields
Your client's name runs all through your project documents - the BIM Execution Plan, the exchange information requirements, the information protocol that forms part of the contract. When the client changes their name, someone has to hunt through every document to fix it. Miss one, and your contract documents disagree with each other.

A SmartField holds the value in one place. Every document reads it from there.
Put a SmartField in your documents
- In Docs, open a section and select the text the SmartField should replace - here, the client's name in the project table.
- In the selection tools, choose Insert SmartField (the {...} button).
- In the list, open Project Information and choose Client Name. The client is one of the project's own details, so it reads straight from the project's Settings.
- Select Save & close. The name now shows as a SmartField, with a small marker above it.

SmartFields belong to the project, so the same one works in your BIM Execution Plan, your exchange information requirements and any other document in the project.
Replace the other matches too
The same text is probably typed in other places. Plannerly notices and asks Replace the other matches too?
- Under Where to replace, choose This document or All documents in this project.
- Select Replace with the number of matches shown. In the lesson that is fourteen places across three documents.

Matches in sections you can't edit stay as typed text, and Plannerly tells you how many.
Let Auto-create do the rest
- In Docs, select SmartFields.
- Select Auto-create SmartFields and choose All project documents.
- Plannerly reads your documents for repeated project details, such as the location and the completion date, and shows what each will become.
- Review the suggestions, then save the ones you want.

Change it once
- Click the SmartField anywhere it appears, in any document.
- Type the new value.
- Select Save.
Every section that uses it updates - not just in this document, but in the exchange information requirements and the information protocol too. A change that reaches many sections carries on in the background, so you can keep working.
If it doesn't work
Clicking a SmartField doesn't open the value box
You don't have Manage SmartFields on your project role. The SmartField still shows its value. Ask a project manager to change it, or to switch the permission on in Roles and Permissions.
Some matches weren't replaced
Matches in sections you can't edit stay as typed text. Ask the section's owner, or someone with edit access, to run the replacement again. In a very large project Plannerly may say it couldn't check every section at once, so run it once more.
I can't delete a SmartField
A SmartField in use in a Published section can't be deleted. Move those sections back from Published first.
"Nothing was replaced"
Plannerly stops if an open section can't be saved. Your draft is still safe: save or close the section, then try again.
Common questions
What happens to sections that are already Published?
A SmartField used in a Published section is locked to it. If you change its value, Plannerly tells you first, then updates the text and moves those sections back to Shared, so they can be reviewed again before they're republished. A SmartField that's in use in a Published section can't be deleted.
Do exports I've already created change too?
No. An export is a record of what was issued, so it keeps the value it was created with. Create a New Version of the export in File Manager to pick up the new value.
Who can create and change SmartFields?
People whose project role has Manage SmartFields switched on, in the Docs group of Roles and Permissions. Without it, SmartFields still show their values, but clicking one doesn't open the value box.
Can every project share the same SmartFields?
SmartFields belong to one project, so each project can hold its own values. For things every project needs - its title, number or address - use the System SmartFields in your company header, footer and cover page: each project fills them in with its own details automatically.
How do I change a client name in every document at once?
Replace the client's name with the Client Name SmartField (accept the offer to replace every match), then change the client in the project's Settings under Details. Every document that uses the SmartField updates.
Related
- Project details, language and time zone - where the Client Name SmartField gets its value.
- Headers, footers and cover pages - System SmartFields that fill in each project's title and number.
- Choose your template library - templates whose SmartFields fill in with each project's values.
- How to insert a SmartField that links to a document name - SmartReferences between documents.
- SmartFields: faster document creation - the longer story on the Plannerly blog.
- ISO 19650-1 - the concepts and principles behind managing information over a project.
Take the free Certified Plannerly Administrator course - every lesson is a short video like this one, with a certificate when you finish.
